encoord Logo
Free Trial

Distributed Energy Resource (DER) Planning

Deeper insights into DER integration - all in a single software

The Challenge

DERs can play an important role in the distribution systemplanning for both the value they provide and the uncertainty they create is critical.

The Challenge

Common DERs

Common DERs

Integrated DER planning with SAInt

SAInt closes the DER planning gap by delivering an integrated and realistic view of DER participation across generation and transmission systems that captures constraints, behaviors, availability, and dependable value, enabling planners to make confident, reliability driven decisions.

Integrated DER planning with SAInt

Step 1: Model the transmission system

Configure and run a physical a simulation of the bulk power transmission.

Step 1: Model the transmission system

Image: A bulk transmission system is modeled.

Step 2: Visualize Transmission and Distribution Systems in a Single Unified Model

Combine bulk power transmission system and distribution system assets into a single unified data model for visualization and assessment.

Step 2: Visualize Transmission and Distribution Systems in a Single Unified Model

Image: A bulk transmissions system with a distribution system feeder attached.

Step 3: Assess Combined Transmission/Distribution Reliability

Validate transmission and distribution reliability by running unified unbalanced AC power flow simulations to pinpoint overloaded assets across both networks.

Step 3: Assess Combined Transmission/Distribution Reliability

Image: Assess the reliability of both distribution-sited and transmission-sited assets.

Step 4: Jointly Optimize System and DER Operations

Jointly optimize bulk power and DER operations while running unbalanced AC power flow simulations to identify overloaded transmission and distribution assets and operational constraints.

Step 4: Jointly Optimize System and DER Operations

Image: Electric vehicle, heatpumps, and battery storage respond to prevent overloading of a distribution transformer.

Step 5: Compare Costs and Reliability Across DER Strategies

Assess the reliability of the bulk power system and DER operations by running unbalanced AC power flow simulations to confirm reliability.

Step 5: Compare Costs and Reliability Across DER Strategies

Image: Transfer dispatches to an unbalanced AC power flow is used to confirm transformer over voltages are avoided.

The Value of DER Planning with SAInt

Discover New, Realistic DER Dispatches

Use SAInt to expand your planning workflow to include thousands of operating scenarios to inform your understanding of the behavior and value DERs can bring to the grid, enabling you to reduce risk and increase reliability.

Understand DER Behavior Across Conditions

SAInt clarifies how DERs perform across seasons, events, and signals, enabling more reliable operations, right sized programs, and confident contingency planning.

Prioritize High Value Investments

Quantify practical participation, identify real network constraints, and direct capital to upgrades that deliver reliability and measurable system cost savings.

See what SAInt can do

Schedule a demo to learn how to streamline DER planning into one seamless, efficient SAInt workflow.

Schedule a Demo
SAInt logo alt white SVG

See More

See the insights that VELCO is gaining from SAInt

Through SAInt, VEC is developing insights into how coordinated DER behavior can improve transmission system operations.

Read the report

VELCO Image

Read the Integrated Planning Guidebook from the Energy Systems Integration Group

“Without … visibility into the magnitude, location, and operation of DERs, … planning will continue to be executed without realizing the value stack of DERs."

Read the report

ESIG Guidebook LI Image

encoord Logo

© Copyright 2025 encoord Inc. & encoord GmbH - All Rights Reserved

Imprint
Privacy Policy
Cookies
Terms of Service