The Ministry of Energy uses SAInt to model the Peruvian electricity network's operation by running a nodal production cost model of their electricity network. The model was validated by encoord for a one-year simulation against the Peruvian electricity network operator's public data. As part of their planning studies, the Ministry can model the national electricity network's short-term operation under potential future conditions and scenarios, including higher penetrations of wind and solar power.
Peru - Power System Production Cost Model
Case Study
Related Case Studies and Use Cases
Previous uses and future potential applications of SAInt
Ready to Learn More?
See how encoord can help you plan for the energy transition