encoord Logo
Talk to an expert

Peru - Power System Production Cost Model

Case Study

The Ministry of Energy uses SAInt to model the Peruvian electricity network's operation by running a nodal production cost model of their electricity network. The model was validated by encoord for a one-year simulation against the Peruvian electricity network operator's public data. As part of their planning studies, the Ministry can model the national electricity network's short-term operation under potential future conditions and scenarios, including higher penetrations of wind and solar power.

Peru PCM

Related Case Studies and Use Cases

Previous uses and future potential applications of SAInt

Ready to Learn More?

See how encoord can help you plan for the energy transition

Talk to an expert

encoord Logo

© Copyright 2024 encoord Inc. & encoord GmbH - All Rights Reserved

Imprint
Privacy Policy
Cookies