The Ministry of Energy uses SAInt to model the Peruvian electricity network's operation by running a nodal production cost model of their electricity network. The model was validated by encoord for a one-year simulation against the Peruvian electricity network operator's public data. As part of their planning studies, the Ministry can model the national electricity network's short-term operation under potential future conditions and scenarios, including higher penetrations of wind and solar power.
![](/_next/image?url=%2Fbg-light.jpg&w=3840&q=75)
Peru - Power System Production Cost Model
Case Study
![Peru PCM](/_next/image?url=https%3A%2F%2Fimages.ctfassets.net%2Fm71d0ufql6ut%2F4yUZgUvfYGWsEWfrhrRJ9N%2F5860747a0a62c7404caa327fe383cc84%2FELECTRIC_PF_2.png&w=3840&q=75)
Related Case Studies and Use Cases
Previous uses and future potential applications of SAInt
![](/_next/image?url=%2Fbg-dark.jpg&w=3840&q=75)
Ready to Learn More?
See how encoord can help you plan for the energy transition